The carpentry began with red chalklines snapped on the slab at the open ends of the tractor barn and ended with trim around the windows. Including trips to local lumber yards the job took about 70 hours and now frames the opening for a door that hopefully will be installed before the first snow flurries. Steel angles anchored to the bolts of the metal roof proved to be the key to anchoring the 2×6 and 2×4 framing for this project. This step would have been easier if the distance between the bolts had matched the hole spacing in the steel, but the end result was sound walls anchored at the roof peak and corners.